Texas records · MONTGOMERY County · SPRING

Primary Literacy Academy of The Woodlands

Licensed Center in SPRING, Texas · Full Permit · permit issued April 14, 2023

State record presented as of November 5, 2026

Address
26315 OAK RIDGE DR, SPRING, TX 77380 1962
Operation type
Licensed Center
Type of issuance
Full Permit
Permit issued
April 14, 2023
Operation number
1752255
Licensed capacity
45 children
Ages served
Infant,Toddler,Pre-Kindergarten,School
Schedule
Mon,Tue,Wed,Thu,Fri · 07:00 AM-05:30 PM
Conditions on permit
NO

The record at a glance

Inspections on record10
Reports (complaints, incidents, self-reports) on record1
Assessments on record0
Standards evaluated across those visits5,593
Citations recorded8
Record coversSeptember 19, 2022 – March 31, 2026

Citations by the state’s risk levels

High1
Medium High3
Medium3
Medium Low1

Visits and findings, newest first

InspectionMarch 31, 20261 citation recorded1 of 684 standards cited at this visit
746.1315(b)(1) - CPR Training and Recertification Adhere to Guidelines-skill basedRisk level: Medium High
5 of 5 caregivers had CPR training that was completed without a skills based hands on component.

Correction verified by the state on April 24, 2026. The state provided technical assistance on this standard.

InspectionApril 10, 2025No citation recorded at this visit0 of 593 standards cited at this visit
InspectionSeptember 19, 2024No citation recorded at this visit
ReportSeptember 10, 2024No citation recorded at this visit0 of 1 standards cited at this visit
InspectionApril 25, 2024No citation recorded at this visit0 of 676 standards cited at this visit
InspectionOctober 25, 20232 citations recorded2 of 1,251 standards cited at this visit
746.801(8) - Required Records Maintained and Made Available - Playground Maintenance RecordsRisk level: Medium
The operation did not have the playground maintenance checklist. Note: It was completed during the inspection.

Corrected at the time of inspection. The state provided technical assistance on this standard.

746.4135(c) - Children's Products-Posting of CPSC websiteRisk level: Medium
The CPSC was not signed by the annual date. Note: it was signed at the inspection.

Corrected at the time of inspection. The state provided technical assistance on this standard.

InspectionMarch 16, 2023No citation recorded at this visit0 of 206 standards cited at this visit
InspectionJanuary 18, 20231 citation recorded1 of 461 standards cited at this visit
746.5205(4) - Documentation of DrillsRisk level: Medium
The operation did not have documentation of December 2022.

Correction verified by the state on January 19, 2023. The state provided technical assistance on this standard.

InspectionDecember 19, 20221 citation recorded1 of 536 standards cited at this visit
746.901(1) - Required Personnel Records - Dates of EmploymentRisk level: Medium Low
Two staff's files were missing the employment date. Note: staff's employment date was added during this inspection.

Corrected at the time of inspection. The state provided technical assistance on this standard.

InspectionOctober 4, 20221 citation recorded1 of 1 standards cited at this visit
746.3407 - Maintenance of Building, Grounds and EquipmentRisk level: Medium High
The patio deck had several lifted board and hazards to children.

Correction verified by the state on October 17, 2022. The state provided technical assistance on this standard.

InspectionSeptember 19, 20222 citations recorded2 of 1,184 standards cited at this visit
746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 MonthsRisk level: High
The operation does not have the initial fire inspection

Correction verified by the state on October 10, 2022. The state provided technical assistance on this standard.

746.3401(a) - Annual Sanitation InspectionRisk level: Medium High
The operation does not have the initial sanitation inspection.

Correction verified by the state on October 12, 2022. The state provided technical assistance on this standard.

This page presents the state’s record for this operation as of November 5, 2026; it is a dated presentation, not a live register. If something here does not match the operation’s current state record, file a correction report.