Texas records · TARRANT County · ARLINGTON

Shine Bright Christian Academy

Licensed Center in ARLINGTON, Texas · Full Permit · permit issued September 15, 2026

State record presented as of November 5, 2026

Address
4201 LITTLE RD, ARLINGTON, TX 76016 5602
Operation type
Licensed Center
Type of issuance
Full Permit
Permit issued
September 15, 2026
Operation number
1824636
Licensed capacity
76 children
Ages served
Infant,Toddler,Pre-Kindergarten,School
Schedule
Mon,Tue,Wed,Thu,Fri · 07:00 AM-07:00 PM
Conditions on permit
NO

The record at a glance

Inspections on record5
Reports (complaints, incidents, self-reports) on record0
Assessments on record1
Standards evaluated across those visits3,967
Citations recorded8
Record coversNovember 13, 2025 – September 8, 2026

Citations by the state’s risk levels

High3
Medium High2
Medium2
Medium Low1

Visits and findings, newest first

InspectionSeptember 8, 2026No citation recorded at this visit0 of 1,263 standards cited at this visit
InspectionMay 27, 2026No citation recorded at this visit0 of 636 standards cited at this visit
InspectionFebruary 26, 20261 citation recorded1 of 798 standards cited at this visit
746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or LessRisk level: Medium High
The operation had loose fill in the amount of 3 inches on the playground when six is required.

Correction verified by the state on March 6, 2026. The state provided technical assistance on this standard.

AssessmentJanuary 16, 20261 citation recorded1 of 1 standards cited at this visit
746.303(b) - Report Number of EmployeesRisk level: Medium Low
The operation did not report the number of staff who ceased employment with them for 2025.

Correction verified by the state on January 29, 2026. The state provided technical assistance on this standard.

InspectionDecember 3, 2025No citation recorded at this visit0 of 5 standards cited at this visit
InspectionNovember 13, 20256 citations recorded6 of 1,264 standards cited at this visit
746.4301(a) - Outdoor Space Requirements - 80 Sq. Feet Per ChildRisk level: Medium
During the application inspection, the facility does not have infant/toddler outdoor playground.

Correction verified by the state on December 3, 2025. The state provided technical assistance on this standard.

746.3701(9) - Safety - Bodies of Water Inaccessible to ChildrenRisk level: High
During the application inspection, a water fountain is running near the front entrance.

Corrected at the time of inspection. The state provided technical assistance on this standard.

746.4907(a)(1) - Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or LessRisk level: Medium High
In the 2-5-year-old outdoor playground, some areas only have 2 inches of loose fill.

Correction verified by the state on December 3, 2025. The state provided technical assistance on this standard.

746.5101(a) - Annual Fire Inspection - Before Initial Permit Issued and Every 12 MonthsRisk level: High
The facility did not have the fire inspection before today's application inspection.

Correction verified by the state on December 3, 2025. The state provided technical assistance on this standard.

746.2206(3)(A) - Written Activity Plan - Child-Initiated - Equipment/Materials In ReachRisk level: Medium
During the application inspection, the facility does not have educational materials for children, such as arts supplies, books, and other activity materials in each classroom.

Correction verified by the state on December 3, 2025.

746.2409(a)(9) - Safety Requirements for Cribs - Documentation that Crib Meets Applicable Federal RulesRisk level: High
During the application inspection, the infant cribs were recalled. The facility will need to replace them with new cribs or playpens.

Correction verified by the state on December 3, 2025. The state provided technical assistance on this standard.

This page presents the state’s record for this operation as of November 5, 2026; it is a dated presentation, not a live register. If something here does not match the operation’s current state record, file a correction report.